All surfacesHI
All service requests
Acting as

SR-24104 · Rite Residences · Block A

Corridor lighting flickering

Corridor lighting flickering. Reported by the client through the portal with photo evidence.

In Progress1h 55m over· 124%
Category: ElectricalPriority: P2 · HighCreated: 14 Aug 14:05 2 photos

Auto-validation

Contract check

CTR-2025-004 · active to 30 Jun 2027

SLA assigned

8h 0m · Electrical

Priority

P2 · High

Chargeable flag

Covered by contract

  1. Created
  2. Validated
  3. Accepted
  4. Scheduled
  5. In Progress
  6. Waiting for Material
  7. Job Completed
  8. Completed

Created

14 Aug 14:05 · Client portal

Validated

14 Aug 14:05 · System (auto-validation)

Accepted

14 Aug 14:05 · Adeel Raza

Scheduled

14 Aug 14:05 · N. Farooq (Supervisor)

In Progress

14 Aug 14:05 · Adeel Raza

Assignment

Assigned technician: Adeel Raza

Next actions

Acting as: Project Manager

No transitions available for this role at this stage.

Locked for this role

Waiting for MaterialJob Completed